Friday 8 March 2013

Prequations in blasting operations

The building and area where abrasive blastng operations are taking place must have: 


The area close sheeted so that the dust particle escape is is kept to a minimum.All windows protected to prevent egress or ingress of dust particle;.


All doors and other opening sealed with adhesive tape.All sanitary plumbing pipe work ,rain water pipes,electrical points protected.


All open inlets to drains suitably covered or sealed to prevent ingress of girt to the drainage system.Any valuable features fully protected or where possible removed.


The immediate  area fully barricade to prevent other persons including members of the public from gaining access.

No comments:

Post a Comment

Motivating Health and safety in your workplace

Motivating employees to improve workplace health and safety is an essential aspect of any successful safety program. Here are some motivatio...