Piling operation

Piling operatin may be the first work which will be carried outbin the construction sites.the risk associated with this work is high.It is neccessary to  review the current safety arrangements and working procedures to ensure a safe work process.The situation which necessitate pile function for a structures are : The structure is very heavy.

*An excavation for foundation is impracticable.

*Problem of sub soil water in the foundation trench.

*The geological conditions found on the site.

*Need of  a special desighns ,such as resistence to ship impact for bridge piles.


*Special friction or standard required relating to the construction.